Portsmouth / Paducah Project Office (PPPO) Operations and Site Mission Support (OSMS)

Draft RFP

DRAFT REQUEST FOR PROPOSAL (RFP) NO. 89303320REM000070

This Draft Request for Proposal (RFP) is NOT a formal request for proposal. Proposals are NOT being requested or evaluated at this time. A Final RFP will be released at a later date for which interested parties may submit proposals. The U.S. Department of Energy (DOE) is seeking interested parties to thoroughly review the Draft RFP and provide comments, questions, suggested changes, and feedback by January 31, 2021, in the MS Excel format provided below. DOE does not anticipate posting responses to any comments, questions, suggested changes, and/or feedback received; however, all input will be considered in developing the Final RFP. Additionally, the Draft RFP is subject to change in the development of the Final RFP as a result of the DOE's consideration of the input received from interested parties in response to the Draft RFP.

Please submit all comments, questions, suggested changes, and feedback to the designated procurement email address at OSMS@emcbc.doe.gov and use the MS Excel format hereby provided for submission.

PART I - THE SCHEDULE
Section B Supplies or Services and Prices/Costs
Section C Performance Work Statement
Section D Packaging and Marking
Section E Inspection and Acceptance
Section F Deliveries or Performance
Section G Contract Administration Data
Section H Special Contract Requirements
PART II - CONTRACT CLAUSES
Section I Contract Clauses
PART III - LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
Section J List of Attachments
J-1 Acronyms
J-2 Requirements Sources and Implementing Documents (List A and List B)
J-3 Accountable Property List (to be inserted after contract award)
J-4 Deliverables
J-5 PPPO Site Services and Interface Requirements Matrix
J-6 J-6 Cover
J-6 J-6A, Paducah Wage Determination (Service Contract Labor Standards (formerly known as the Service Contract Act)) and Paducah Construction Wage Rate Requirements (formerly known as the Davis-Bacon Act)
J-6 J-6B, Portsmouth Wage Determination (Service Contract Labor Standards (formerly known as the Service Contract Act)) and Portsmouth Construction Wage Rate Requirements (formerly known as the Davis-Bacon Act)
J-6 J-6C, Lexington Wage Determination (Service Contract Labor Standards (formerly known as the Service Contract Act)
J-7 Facilities/Areas Responsibility Matrix and Site Services
J-8 J.8.C.5.3.6a – List of Less Than 180g U-235 Enriched Heel Cylinders
J-8 J-8.C.5.3.6b – List of Enriched Heel Cylinders With Greater Than 180g And Less Than 350g U-235
J-8 J.8.C.5.3.3 – Off-Spec Cylinders Less Than 0.96%
J-9 Contract Security Classification Specification (to be inserted after contract award)
J-10 Performance Evaluation and Measurement Plan (to be inserted after contract award)
J-11 Small Business Subcontracting Plan (to be inserted at the time of contract award)
J-12 Crosswalk for Contract Baseline Development
J-13 Emergency Management and Fire Protection Agreements
J-14 Executed Performance Guarantee Agreement (to be inserted at the time of contract award)
J-15 Contractor’s Community Commitment Plan (to be inserted at the time of contract award)
J-16 Key Personnel Position Qualifications for the Required Engineering Manager and Non-Required Key Positions
PART IV - REPRESENTATIONS AND INSTRUCTIONS
Attachment L-6 Cost and Fee/Profit Elements Worksheet
Attachment L-7 Consolidated Direct Cost Schedules
Section K Representations, Certifications, and Other Statements of Offerors
Section L Instructions, Conditions, and Notices to Offerors
Section M Evaluation Factors for Award