West Valley Demonstration Project (WVDP) Phase 1B Contract
The U.S. Department of Energy (DOE) is seeking a contractor for the continuation of Phase 1B Deactivation and Demolition (D&D) and Soil Remediation activities to be performed at the DOE West Valley Demonstration Project (WVDP) Site in western New York state. The major elements of scope include, but are not limited to: Removal of the below-grade portion of the Main Plant Process Building (MPPB), Vitrification Facility (VF), Ancillary Support Building, and the remediation of soils within Waste Management Area (WMA)-1; Removal of the Radioactive Waste Water Treatment System, including the lagoons, and remediation of the soils within WMA-2; maintenance of the Remote Handled Waste Facility (RHWF); operation and maintenance (O&M) of the of Reservoir, Spillway & Rail Line; management of the Permeable Treatment Wall (PTW); management of the High Level Waste Canister Interim Storage Facility; management of the Waste Tank Farm; management of the Nuclear Regulatory Commission (NRC) Licensed Disposal Area; Waste Management and handling of nuclear materials; Safeguards and Security (S&S); Environmental, Safety, Health, and Quality Assurance (ESH&QA) requirements and business administration; and day-to-day operations, maintenance, and repair of designated facilities, systems, and equipment.
- Contact
- WVDPPhase1B@emcbc.doe.gov
- Contracting Officer
-
LeAnn Brock
LeAnn.Brock@emcbc.doe.gov
- Page Last Updated
- 9/20/2023
News and Announcements
9/20/2023 | A Special Notice was posted on SAM.gov that the U.S. Department of Energy is providing updated procurement schedule information regarding near-term Final RFPs. Any questions and/or comments related to this announcement should be submitted to Aaron Deckard, Procurement Director, EMCBC, at the following email address: EMProcurementNews@emcbc.doe.gov |
8/29/2023 | The WVDP Phase 1B Draft Request for Proposal (RFP) has been posted to the Draft RFP tab for review. DOE will hold a Pre-Solicitation Conference, site tour and one-on-one sessions with interested parties on September 21 and 22, and if needed September 20, 2023. Information and registration documents have been uploaded to the Pre-Solicitation Information tab. In addition, the Documents Library tab has been populated with information associated with the procurement. |
6/27/2023 | A Special Notice was posted on SAM.gov that the U.S. Department of Energy is providing updated procurement schedule information regarding near-term Final RFPs. Any questions and/or comments related to this announcement should be submitted to Aaron Deckard, Procurement Director, EMCBC, at the following email address: EMProcurementNews@emcbc.doe.gov. EM Procurement Special Notice |
2/16/2023 | DOE releases an updated RFI notice for the WVDP Phase 1B D&D and Soil Remediation Contract. |
10/10/2018 | DOE releases a Request for Information notice for the West Valley Demonstration Project (WVDP) Phase 1B Deactivation and Demolition (D&D) and Soil Remediation Contract. |